Tesla has big plans for its big roof in Nevada. The electric automaker/energy company has said from the beginning that its
Gigafactory (which, as future plans
have expanded, has come to be known as ‘Gigafactory 1’) would be a net-zero-energy production facility powered by renewables.
Electrek reports that on a recent tour for investors, though, Tesla said just how massive onsite solar power generation capacity would be: 70 megawatts.
That’s about seven times larger than any other rooftop installation in the world. (For comparison, the current largest installation on a single roof is a 42-acre, 11.5-MW solar farm on the
Dera Baba Jaimal Singh in Beas, India.) Thanks in large part to this solar power system, Tesla says the GF1 won’t directly consume any fossil fuels. The factory will be able to store excess energy in Tesla’s own Powerpack batteries for use when the sun isn’t shining. It’s likely that Tesla will also be using its own photovoltaic panels, thanks to its
acquisition of
SolarCity.
Additionally, the Gigafactory will use a closed-loop system to save water, will heat its factory using waste heat – a byproduct of battery manufacturing – and recycle batteries onsite.
A document given to investors also outlines how Tesla is lowering operational costs and the cost of cells and batteries, for which
production recently began. Tesla says GF1 will have 35 GWh of annual cell production capacity and 50 GWh of battery production capacity by the end of its current construction phase.
Related Video:
Video ID:
94ad85c0-58d8-3c6e-8a66-30ae8bb8a2f0
Playlist ID:
Autoplay:
false
Mute:
false
Continuous:
false
Ad Key:
Ad Value:
