Just as TTAC has finally put down their Tesla Birthwatch series and the first actual customer car has been delivered, the EV manufacturer has seen fit to update their customers on plans for the rest of the year. Although the car with serial number 2 destined for company founder Martin Eberhard started down the assembly line on March 17 of this year, only cars 3 and 4 have actually left the factory to date. According to the update letter from Marketing VP Darryl Siry, the factory is preparing to start assembly on cars 6 and 7. Tesla announced earlier in the year that initial production would be very slow as they stamp out bugs in the process. According to the schedule in the letter, the first couple of dozen Founders Series cars should be done by the end of June. After that the Signature 100 cars will be built for those customers that paid full price up front with that batch done by October. After that production really ramps up with the 600 2008 models expected to be complete by about April 2009.

Perhaps more important is the update on the new powertrain. Apparently the new power electronics module is going through durability testing right now. With the 850A current level the motor is putting out about 280lb-ft of torque and pushing the Roadster to 60mph in the original 3.9sec. A running change to the new hardware should take place sometime in September with vehicle 40 or so. The cars built prior to that will get free upgrades to the new hardware. The letter also clarifies the warranty at 3 years/36,000 miles although a 4 year/50,000 mile will be available at extra cost. Tesla had planned to charge an upfront fee of $8,000 that would cover the cost of shipping vehicles to a service center if the customer lived more than 100 miles from a Tesla Store. That has now been dropped in favor of a pay as you go scheme. As for those stores, the LA outlet is now open with a Menlo Park store opening this summer and New York in the fall. In the first quarter of '09 Chicago, Miami and Seattle outlets should debut. In addition Tesla plans to open satellite service centers in major cities over the next two years. If you aren't already on the list a 2009 Roadster will now set you back a minimum of $109,000 while a fully loaded example will run $120,200.

[Source: Tesla Motors]

Dear XXX,

Since we last provided a program update we have achieved an extraordinary milestone - on March 17th, the Tesla Roadster entered regular production. In this program update we will focus on a wide variety of topics that relate to the program now that we are in this new phase, including:

1.Production Schedule
2."Powertrain 1.5"
3.Warranty
4.New "Out of Service Area" Policy
5.Store and Service Center locations and timing
6.Additional News

Production Schedule

Now that production has started, we would like to provide you with an update on the plan and status of production. Although everyone is eager to receive their cars as soon as possible, it is important in this program, and any automobile program, to start the production line slowly and to increase the rate at which cars are manufactured at a very deliberate pace. This "slow ramp" ensures a high level of quality even with the first cars off the line. Inevitably, there are process and quality issues that come up as one increases the rate of production and a slow ramp rate enables us to address a myriad of issues in a controlled manner – remember that the Roadster is not just a new car it is a new automotive paradigm.

After an initial period of slow production rates, the pace of production starts to pick up until we are producing in excess of 100 cars per month by November. For this reason, the delivery of the approximately 600 2008 Model Year cars is weighted toward the end of this year and beginning of next year.

The data below is intended to provide a guideline as to when we plan to achieve specific milestones in vehicle production. While this data will give you a sense of when your car will be produced, the actual delivery time will lag by about 8 weeks to allow for shipping and finishing. You will be contacted by Member Services 3 months prior to your expected production date to confirm details.

VIN# Planned Production Month
Founders' Series March-June 2008
Signature 100 #1 July 2008
Signature 100 #100 October 2008
VIN #200 November 2008
VIN #300 December 2008
VIN #400 February 2009
VIN #500 March 2009

In the past 2 months, we have moved more slowly than our planned pace of 1 car per week. At the time of this writing, we are preparing to put cars number 6 and 7 on the line. This is by our own doing, as we have identified and addressed some minor supplier issues and teething pains. We expect to get back on pace so have not changed the overall schedule.

This is exactly the kind of situation we anticipated and is the reason for the slow initial ramp. In the early going, it is easier to address issues that inevitably crop up and then get back on track without major impact to the overall schedule. One thing is for certain: we will not sacrifice quality or customer satisfaction to force the schedule.

As we have mentioned before, the plan is to stick to a relatively slow pace of production until "Powertrain 1.5" is ready for insertion into the production process. At this time, we can then start to accelerate the production pace.

"Powertrain 1.5"

The development of "Powertrain 1.5" is progressing very well. We have the newly designed PEM (Power Electronics Module) running at the higher 850 amp level in a prototype car being used for durability and other testing. The higher current levels are generating the expected higher levels of torque (~280 lb. ft) that will enable the same 3.9 second 0-60 acceleration with the new single speed gearbox under development. This new powertrain configuration is planned to be inserted into the production schedule in September, at about the 40th car. All cars produced prior to this switchover will be upgraded free of charge as previously discussed.

Warranty

Tesla has established a comprehensive warranty for the Roadster. The 3 year/36,000 mile base warranty covers all aspects of the car for defects in materials and workmanship. The battery pack is part of this comprehensive warranty. Details about the warranty will be covered in your owner's documentation.

Tesla will offer an extended warranty option at no cost to 2008 Roadster Club members, extending the coverage to 4 years/50,000 miles. Purchasers of later model year Roadsters will be offered the extended warranty at additional cost.

The battery pack is expected to last longer than the warranty period, although repairs beyond the warranty period will be charged at regular part and labor rates.

All high-energy lithium ion cells experience a gradual loss in maximum capacity based on usage levels, time, and other factors. Your owner's documentation will include information on expected behavior of the battery over time and the factors that affect the rate of wear.

Out of Service Area Service Policy

Based on customer feedback and other practical considerations, the "Out of Service Area" policy has been changed. The original policy required a fee of $8,000 to be paid on delivery of the car to cover additional transport costs over the life of the warranty for customers who are located further than 100 miles from a Tesla Service Center.

This policy has been replaced with a simpler approach. Instead of paying an up-front fee, customers who are located outside a Tesla service area are responsible for the costs associated with transport to and from Tesla Service Centers. Tesla Customer Service will coordinate long distance transport on behalf of the customer if desired.

Store and Service Center Locations

Tesla's flagship Los Angeles Store is now open to the public. The Menlo Park Store will open this summer, although it will be operational and servicing cars sooner than that.

Over time Tesla Motors will build additional Stores containing both sales/service facilities across the country. For now, the priority is to establish purpose-built service facilities to service cars that are planned for delivery over the next 12 months. Based on the number of cars due to be delivered in various markets, we anticipate opening additional service facilities in the following order:

1.Los Angeles – Open
2.Menlo Park – Summer 2008
3.New York – Q4 2008
4.Chicago – Q1 2009
5.Miami – Q1 2009
6.Seattle – Q1 2009

Specific locations and dates are yet to be established. Additional locations will be announced in the future. We expect to establish service offerings in all major US cities by 2010.

Additional News

Tesla Motors recently announced that the Tesla Roadster would be available for delivery in Europe beginning April, 2009. For the first year, a special "Signature Edition" of 250 cars will be offered for all of Europe. This special edition car, fully loaded and highly customized, sells for 99,000 Euro (excl. VAT). We plan to establish service facilities in key European cities, starting with London, Paris, Munich, Northern Germany, Milan, Oslo, Copenhagen (this list is being finalized). Many of you have enquired about European delivery for yourself or on behalf of a friend or colleague, so we wanted to let you know about this special offer. If you are interested in learning more or want to help us with our European launch, just let us know or email eurosales@teslamotors.com.

We recently announced pricing on the 2009 Tesla Roadster in the U.S. The base price is expected to be $109,000. With all factory options, the Roadster will cost about $120,200. This price increase does not affect any member who has already reserved a 2008 Roadste


I'm reporting this comment as:

Reported comments and users are reviewed by Autoblog staff 24 hours a day, seven days a week to determine whether they violate Community Guideline. Accounts are penalized for Community Guidelines violations and serious or repeated violations can lead to account termination.


    • 1 Second Ago
  • From Our Partners

    You May Like
    Links by Zergnet
    Cars for Sale Near You

    Share This Photo X